Participation on the Board of Civil Consultants, during the Formal Inspection and elaboration of Technical Reports in the following hydroelectric plants:
• CHESF: HPP’s Boa Esperança, Sobradinho, Itaparica and Paulo Afonso IV, in 1999;
• CEEE: HPP Dona Francisca, in 2003 and 2006;
• ENERCAN: HPP Campos Novos, from 2009 to 2012;
• BAESA: HPP Barra Grande, from 2007 to 2012;
• ENERG: HPP Corumbá III, in 2010 and 2011;
• TRACTEBEL – LEME: HPP Salto Osório and Salto Santiago, in 2013.