According to ANEEL Normative Resolution No. 696/2015, the preparation of the PSB -  Dam Safety Plan is the responsibility of the entrepreneur, and must be conducted by the technical responsible and contain the information provided in Law 12344/2010. It covers the technical data of construction, operation and maintenance of the enterprise, highlighting the Manuals of safety inspections and monitoring, Dam Safety Reports, Regular Inspection Reports, Periodic Safety Review, Emergency Action Plan, when required.

SBB Engenharia has elaborate the PSB – Dam Safety Plan for some dams, highlighting the fact that it recently developed the PSB for the Rodeio Bonito SHPP in Santa Catarina, with a Main Dam in RCC with 223 m long and 32.2 m high owned by VELCAN Energy.